Reply to thread

It's a relief to see your progress reports, Lee.  We know progress on your travels is going to plan, and you are all safe and sound.  And probably holding a glass of wine.  :) 

 

Give me a break Bill, make sure your posts are big enough to read without a magnifying glass.  And then you flew me for a loop when you used a word like "Wriaote".  (Time to wipe some nose prints off the screen.)

 

KC;  It seems like about half of us had to deal with high winds yesterday.  Glad you didn't have to deal with any actual storms.  We didn't either, but it sure got our attention when those high winds kicked up.  So sad that Ginger gets freaked out.

 

I feel so sorry for Art developing so much arthritis, K2.  That stuff never seems to get better.  We just get better pain medications.  Fuzzbutt seems to be doing fine.  Yes, our 1/2 bath construction continues today.  Let me explain our basement.  It's been divided up into 4 rooms.  Each having a door on them.  The laundry room and the furnace/storage room just have cement floors with cement block walls and the studs showing on 2 of their walls.  Then there is the large room that has the big TV, all Kathi's sowing stuff, and the exercise equipment.  Its' walls all have paneling and dropped ceilings with tiles on the floor.  Then there's my work/project room with all my tools, work bench and  table saws.  It too has paneling on all its' walls and a dropped ceiling with tiles on the floor.

 

Inside my work/project room is where the half bath is going.  (Remember, it does have a door.)  Half-bath just means a toilet and a sink, but no shower or tub.  The toilet and sink will just be along one wall.  We decided against boxing it in since it does have a door.  And it would make the room smaller.

 

Kathi took a before picture, and soon will be taking an after picture of this potty and sink wall.

 

 


Top